Data Center Power, On Your Timeline
Your building can be ready long before the utility is. GPG designs and builds behind-the-meter (BTM) power so colocation, edge and AI/GPU sites energize and start earning before the grid interconnection lands.
One hand to shake, from concept to commissioning.
The grid is now your critical path.
Utility queues: 2,000+ GW of generation and storage is waiting to connect to the U.S. grid, more than the entire installed U.S. fleet. (Berkeley Lab, Queued Up 2026)
Equipment: 52 to 80 weeks for medium-voltage switchgear and 40 to 65 weeks for pad-mount transformers. (2026 contractor procurement data)
Schedules: 30 to 50% of U.S. data center projects planned for 2026 are expected to slip, driven by power constraints and equipment shortages. (Sightline Climate, 2026)
Every month a finished building waits on the utility is a month of lost revenue.
What we deliver
Bridge-to-grid power: on-site generation and battery storage sized to carry your load until utility service arrives, then kept as backup and resilience.
Switchgear and equipment procurement: we source long-lead gear early and manage vendors so equipment shows up when construction needs it.
Permitting and interconnection: building and safety, air quality, fire and every other authority having jurisdiction, plus utility coordination from application to energization.
Design-build execution: engineering, construction, installation and commissioning under one contract and one accountable integrator.
Monitoring, DCIM and energy management: visibility into power, cooling and capacity after the ribbon cutting, with ongoing maintenance.
Built for the mid-market
Colocation and edge developers building 5 to 100 MW without an in-house power team, and AI/GPU tenants retrofitting existing buildings. Projects too complex for an electrician and too small for the large EPC firms.
How it works
1. Assess (2 to 4 weeks). Our paid Time-to-Power Assessment answers three questions: can this site get power, how much, and when. 50% of the fee is credited toward design-build signed within 90 days.
2. Design-build. We design, procure, permit, build and commission your behind-the-meter system.
3. Operate. Monitoring, maintenance and DCIM keep the site performing.